Amarillo Pavement Pros: Driveway Permit in Amarillo: Why the Approach Is the Catch
Amarillo Pavement Pros put this guide together from the City of Amarillo's own pages, because whether a driveway needs a permit turns on a single word. Ask around and you will get a confident answer in either direction. The city's Building Safety department gives a more useful one, and it starts with where your lot line runs.
What the city's own pages say
The Building Safety department's page titled "Work Exempt / No Permit Needed" lists, among the work that needs no permit:
"Driveways located within private property lot lines (excluding approach)."
So paving that stays inside your lot lines is on the exempt list. The approach is expressly not.
Two other city pages fill in the rest. The Building Safety fee schedule lists a Driveway / Sidewalk Permit at $144.00. The Right of Way (ROW) Division's page publishes standard details for a "Residential Driveway, with existing Sidewalk" and a "Residential Driveway, without existing Sidewalk", and says that all permit applications must be submitted via the eBuilder software.
This guide reports only what those pages say. It is not a reading of the whole Amarillo Code of Ordinances, and it is not legal advice.
What counts as the approach
The approach is the part of a driveway that leaves your property and connects to the street. Depending on the street, it can cross the strip of ground between your lot line and the curb, cross a public sidewalk, and meet the curb and gutter where vehicles drop down to the road.
That is the part of a driveway that sits in public space: people on the sidewalk cross it, and the gutter carries street water past it. The plain reading of the exemption is that the city leaves the owner alone inside the lot lines and keeps a say over the piece that meets the public way.
Where your lot line really is
Because the exemption is written around lot lines, it helps to know where yours runs. Many owners assume their property goes all the way to the curb. On a lot of residential streets it does not, and the strip nearest the street, sometimes including the sidewalk, sits outside the private lot.
The reliable way to find out is the plat or survey for the property, which shows the lot lines. A careful contractor raises this early; if one does not, raise it yourself.
Four common jobs, and where each one lands
| Job | Where it lands |
|---|---|
| Resurfacing or replacing a driveway inside the lot lines, approach left as it is | The case the exempt list describes |
| Replacing the whole driveway, approach included | Has a part the city expects to hear about; ask which application applies before the old approach is broken out |
| A new driveway, or a new opening at the curb | Approach work by definition, the situation the ROW standard details exist for |
| Widening a driveway where it meets the street | Changes the approach, so treat it like a new one |
The exempt wording covers driveways within private lot lines, so leaving the approach untouched is what keeps the first job inside it.
Not sure whether your job touches the approach? Describe the driveway and where it meets the street, and ask which city application applies before anyone breaks out concrete.
Call (806) 375-4850Commercial lots have their own permit line
A parking lot is not a house driveway. Amarillo's zoning ordinance, Sec. 4-10-211(3)d, says a building permit is required for any new parking space or change in an existing parking space. The city's Development Policy Manual says the same, and adds that for new construction this permit may be considered part of the building permit for the structure.
The ROW standard details on the city's page are residential, so a commercial owner should confirm with the city rather than assume the residential process applies. The Amarillo parking lot code page covers the paving and marking rules, and commercial asphalt paving in Amarillo covers the work itself.
The $144 permit and the eBuilder application
Two things are confirmed: the $144.00 Driveway / Sidewalk Permit on the Building Safety fee schedule, and the ROW Division's statement that all of its permit applications go through eBuilder. The same ROW page says its permit fees depend on the type of work.
Whether a given approach is covered by the Building Safety permit, a separate ROW application, or both is a question for the city, along with approval times and inspection steps. Ask when you plan the work.
The permit fee is a city fee. It is separate from the price of the paving, and a quote may or may not include it. The Amarillo asphalt driveway cost guide covers the paving price itself.
Construction details come from the city
Approach material, thickness, width, slope and how a sidewalk crossing is rebuilt are all questions for the ROW Division at the time you apply, answered from whichever standard detail it currently publishes. Older driveway drawings still turn up online, so check that any drawing is the current one before building to it. If a contractor or a neighbour tells you a rule, ask where it is written.
Questions to settle before anyone starts
- Does the work touch the approach, the sidewalk or the curb, or does it stay inside the lot lines?
- Where exactly are the lot lines on this property?
- Who applies to the city, and is the $144.00 fee in the price?
- Which ROW standard detail applies, with or without an existing sidewalk?
- Is the approach priced as its own line on the quote?
- Is the property inside Amarillo city limits?
Settle these before signing. A permit question that surfaces once the old approach is broken out leaves an open cut at the street while it is resolved. A contractor offering asphalt driveway paving in Amarillo should be comfortable answering all six. Approach work is priced job by job.
Canyon and the county are separate
Everything above comes from City of Amarillo pages. Canyon, about 15 miles south, is its own incorporated city and the seat of Randall County, with its own ordinances and permitting, so a Canyon driveway is checked with the City of Canyon. Property outside both cities' limits is checked with the county that covers it. Calls are taken for Amarillo, Canyon and 20 miles around them, so it is worth knowing which authority your address answers to before the first quote.
Questions about a piece of ground near Amarillo? Call (806) 375-4850
Frequently Asked Questions
Driveway Permit in Amarillo: Why the Approach Is the Catch: Questions
Do I need a permit to repave my driveway in Amarillo?
The city's Building Safety page lists driveways located within private property lot lines as work needing no permit, excluding the approach. If the work stays inside your lot lines and leaves the approach alone, it falls within that wording. If it touches the approach, check with the city before work starts.
How much is a driveway permit in Amarillo?
The City of Amarillo's Building Safety fee schedule lists a Driveway / Sidewalk Permit at $144.00. Fees change, so confirm the current figure with the city when you apply.
Where are driveway approach applications made?
The city's Right of Way Division says all of its permit applications must be submitted through the eBuilder software. Whether a particular approach also needs the Building Safety permit is a question to put to the city directly.
Does a commercial parking lot need a permit?
Amarillo's zoning ordinance, Sec. 4-10-211(3)d, requires a building permit for any new parking space or change in an existing parking space, and the Development Policy Manual says the same.
Do the same rules apply in Canyon?
No. Canyon is its own incorporated city with its own ordinances and permitting, so a Canyon driveway is checked with the City of Canyon. The Amarillo pages summarised here do not cover it.